|
KOREA HYDRO & NUCLEAR POWER CO., LTD.
|
· FME Management Support Services for Saewool Unit 2 |
2025 |
|
KOREA HYDRO & NUCLEAR POWER CO., LTD.
|
· In-Service Inspection of Reactor Pressure Vessels for Shin-Kori Units 1 and 2 |
2025 |
|
KOREA SOUTH-EAST POWER CO. Yeongheung Power Division
|
· 2025 Build-Up Welding Work for Pulverizer Grinding Rolls of Yeongheung Units 3 & 4
· Wear Screw Tungsten Carbide (WC) Hardfacing
· Fabrication of Tungsten Carbide Reinforced Grit Funnel for Yeongheung Unit 6 Pulverizer
· Tungsten Carbide Liner for the Lower Wear Area of the Yeongheung Unit 6 Pulverizer Mill Body |
2025 |
|
KOREA EAST-WEST POWER CO.,LTD. Dangjin Power Complex
|
· Dangjin Units 7 & 8 Pulverizer Gearbox Replacement (Annual Unit-Price Contract) |
2025 |
|
GEUMHWA PSC CO.,LTD.
|
· 2025 Yeongheung Thermal Power Unit 6 Planned Preventive Maintenance (Boiler – Subcontract)
· Subcontract for Installation of Tungsten Carbide Armour Ring Segments for the Pulverize
· Installation of 4 Tungsten Carbide Armour Ring Segments for the Pulverizer
· Replacement of 18 Pulverizer Rocker Arm Hoods
· Improvement of 4 Pulverizer Grit Funnel Expansion Pipes |
2025 |
|
JEONBUK COGENERATION CO., LTD.
|
· Repair and Build-Up Welding Work for Roll Tire and Table Liners |
2025 |
|
GS Donghae Electric Power CO., LTD.
|
· Fabrication of Tungsten Carbide Dynamic Classifier Rotors (Manufacture and Delivery of 5 Units) |
2025 |
|
HANKOOK CEMENT
|
· Pohang Branch R/M #2 Table Liner Build-Up Welding Work |
2025 |
|
KEPS
|
· Overhaul of Pulverizer Internal Components and Auxiliary Equipment for Taean Unit 10
· Tungsten Carbide Build-Up Welding Work for Pulverizer Cover Cones – Taean Unit 10 |
2025 |
|
ILJIN Power
|
· Pulverizer and Single Pipe Replacement Work for GS Donghae Power Unit 1
· Repair Work for Pulverizer Center Feed and Outlet Coal Pipe Damaged Areas
· Upper & Lower Tungsten Carbide Liners for Separator Top
· Fabrication of 6 JOURNAL SKIRTS |
2025 |
|
KOREA SOUTHERN POWER CO.,LTD. Hadong Thermal Power site Divi…
|
· Build-Up Welding Work for Major Pulverizer Components – Hadong Unit 4 |
2025 |
|
Korea Zinc
|
· Repair of 6 COOLING COILS
· Repair of 3 EXTRACTOR SCREW
· Tungsten Carbide Build-Up Welding for 3 ROLL TIRES
· Tungsten Carbide Build-Up Welding for 1 GRINDING PLATE SEGMENT |
2025 |
|
KOREA SOUTH-EAST POWER CO., LTD. Samcheonpo Power Division
|
· Samcheonpo Power Division Unit 3 Pulverizer Grinder Roll Fabrication & Purchase (12 EA) |
2025 |
|
Daehan Cement CO., LTD.
|
· Fabrication of Tungsten Carbide FEED CHUTE |
2025 |
|
SSANGYOUNG CONSULTING AND TEC
|
· Fabrication of CBS Probe Chromium Carbide Liner Parts for Yeongwol Unit 1 Kiln |
2024 |
|
SUNGSHIN CM CO., LTD
|
· Overhaul Work for Hydraulic Cylinders of Roller Tires No. 1 and 2
· Replacement Work for Tungsten Carbide Plates in Mill Scraper Seal |
2024 |
|
KOREA MIDLAND POWER CO., LTD. Shin Seocheon P.G. Site Div.
|
· Emergency Repair Work for Damaged #C Roller Tire of the Shin Seocheon Pulverize |
2024 |
|
SOOSAN INDUSTRIES CO., LTD.
|
· Fabrication of 14 Tungsten Carbide OD Bearing (Inspection Window) Parts
· Overhaul and Removal Work for the Coal Unloader O.D. House |
2024 |
|
GEUMHWA PSC CO.,LTD.
|
· Planned Preventive Maintenance Work for Boiler, FGD, and Coal Handling Facilities — Yeongheung Unit 6”
· Fabrication of Tungsten Carbide ARMOUR RING SEGMENTS for Yeongheung Unit 5
· Tungsten Carbide Build-Up Welding Work for Worn Coal Nozzles of Yeongheung Unit 3 Pulverizer |
2024 |
|
JEONBUK COGENERATION CO., LTD.
|
· Repair and Build-Up Welding Work for ROLL TIRES and TABLE LINERS |
2024 |
|
Daehan Cement CO., LTD.
|
· Tungsten Carbide Blade – 120 EA
· Tungsten Carbide Upper Ring
· Tungsten Carbide Lower Ring |
2024 |
|
Korea Zinc
|
· Build-Up Welding for 3 Roll Tires
· Build-Up Welding for 3 Grinding Plate Segments |
2024 |
|
KOREA MIDLAND POWER CO., LTD. Boryeong P.G Site Div.
|
· Overhaul and Removal of GRINDING ROLL TIRES for Boryeong Unit 4 Pulverizer
· Build-Up Welding Work for the Pulverizer Grinding Section of Boryeong Unit 8 |
2024 |
|
ILJIN Power
|
· 2024 B-Class Planned Preventive Maintenance Work for Boiler, Turbine, and Auxiliary Facilities of GS Donghae Power Unit 2
· Repair Work for Worn Manhole Areas of the GS Donghae Power Unit 2 Pulverize
· Reinforcement and Welding Work for Worn Areas of the GS Donghae Power Unit 2 Pulverizer |
2024 |
|
KEPS
|
· Overhaul of Pulverizer Internal Components and Auxiliary Equipment for Taean Unit 10
· Installation Work for the Coal Feeder Outlet Hoppe
· 2024 Technical Consulting Services for 20,000-Hour Periodic Maintenance of Pulverizers for Taean Units 9 and 10”
· Overhaul of Pulverizer Internal Components and Auxiliary Equipment for Taean Unit 9 |
2024 |