Client Project Details Year
GEUMHWA PSC CO.,LTD.
· Tungsten Carbide Build-Up Welding Work for Worn Coal Nozzles of Yeongheung Unit 3 Pulverizer
· Fabrication of Tungsten Carbide ARMOUR RING SEGMENTS for Yeongheung Unit 5
· Planned Preventive Maintenance Work for Boiler, FGD, and Coal Handling Facilities — Yeongheung Unit 6
2024
17th Infantry Division
· Major Overhaul 37) "감00" Outpost ‘Better Barracks Dining Facility’ (Mechanical Work) 2023
GEUMHWA PSC CO., LTD.
· Planned Preventive Maintenance Work for Boiler, FGD, and Coal Handling Facilities — Yeongheung Unit 6 2023
KEPS
· Technical Consulting Services for 20,000-Hour Periodic Maintenance of Pulverizer #A and #E for Taean Unit 9
· Overhaul of Pulverizer Internal Components and Auxiliary Equipment for Taean Unit 10
· Tungsten Carbide Build-Up Welding Work for Pulverizer Cover Cones of Taean Unit 10
2023
KOREA MIDLAND POWER CO., LTD. Boryeong P.G Site Div.
· Build-Up Welding Work for Unit 8 Pulverizer, and Removal/Overhaul of 16 Roll Tires for Unit 8
· Overhaul of 16 Roll Tires for Unit 7
· Build-Up Welding Work for Unit 7 BOWL TABLE
2023
KOREA SOUTH-EAST POWER CO.LTD. Yeongheung Power Division
· Tungsten Carbide Build-Up Welding Work for Pulverizer Bull Ring Segments of Yeongheung Unit 4
· Installation Work for Mechanical Handling Equipment under the Conditional Procurement & Fabrication Project for Environmental Facilities of Yeongheung Units 1 and 2
· 2023 Planned Preventive Maintenance Work for Boiler, FGD, and Coal Handling Facilities of Yeongheung Units 5 and 6(Including Pulverizer Units 5 & 6 Internal Liner Installation and Tungsten Carbide Welding)
2023
Doosan Enerbility CO., LTD.
· Installation and Build-Up Welding Work for Cone Covers of Boryeong Units 3 and 4
· Installation and Reinforcement Work for Internal Grit Funnels (A to F) of Boryeong Unit 4 Pulverizer
2023
SK Ecoplant CO.,LTD.
· Pulverizer Disassembly and Overhaul Work for the Go-Seong Thermal Power Plant 2023
GS Donghae Electric Power Co., Ltd.
· Fabrication and Installation of Pulverizer Classifier Rotor
· B-Class Planned Preventive Maintenance Work for Boiler, Turbine, and Auxiliary Facilities of Unit 1
· Tungsten Carbide Build-Up Welding Work for Pulverizer Grinding Roll Tires and Bull Ring Segments of Boiler Units 1 and 2
2023
KOREA WESTERN POWER CO., LTD. Taean Thermal Power Complex D…
· Taean Unit 1-4 boiler tube thermal spray coating work
· Removal and Overhaul Work for 18 Pulverizer Roll Tires of Unit 1
· Build-Up Welding Work for the Pulverizer Bowl Table of Unit 1
· 20,000-Hour Periodic Maintenance Work for Pulverizer #A and #E of Unit 9
· Overhaul of Pulverizer Internal Components and Auxiliary Equipment for Taean Unit 10
2023
JEONBUK COGENERATION CO., LTD.
· Build-Up Welding Work for Roll Tires and Table Liners 2023
SOOSAN INDUSTRIES CO., LTD.
· B-Class Planned Preventive Maintenance Work for Boiler, Turbine, and Auxiliary Facilities of GS Donghae Power Unit 1
· Improvement and Reinforcement Work for Worn Areas of Boiler Pulverizers (#A–E) of Unit 1
2023
SAE-A STX ENTECH CO., LTD.
· Installation Work for Mechanical Handling Equipment under the Conditional Procurement and Fabrication Project for Environmental Facilities of Yeongheung Units 1 and 2 2023
Hanil Cement CO.,LTD.
· On-Site Build-Up Welding Work for Polycom Rolls (3 Times Annually) 2022
KOREA EAST-WEST POWER CO.,LTD. Dangjin Power Complex
· Unit-Price Contract for Build-Up Welding Work on Pulverizers of Dangjin Power Complex Units 5–8 2022
KOREA WESTERN POWER CO., LTD. Taean Thermal Power Complex D…
· Build-Up Welding Work for Pulverizer Grinding Sections of Taean Thermal Power Complex Division Units 2 and 4 2022
Korea Zinc
· Build-Up Welding for Roll Tires and Bearing Disassembly/Assembly and Repair Fabrication
· Fablication of a Roll Tire (Grinding MPS 140BK, 200BK)
· Fablication of a Grinding Plate
· Repair and Build-Up Welding for 3 COOLING COILS
2022
KEPCO KPS
· Water Wall Tube Coating (Side) 2022
KOREA MIDLAND POWER CO., LTD. Shin Boryeong P.G. Site Div.
· Build-Up Welding Work for the Pulverizer Grinding Section of Shin Boryeong P.G. Site Div.Unit 2 2022
KOREA WESTERN POWER CO., LTD. Taean Thermal Power Complex D…
· Emergency Repair Work for Damaged Pulverizer #A of Taean Thermal Power Complex Division Unit 1 2021
ILJIN Power
· GS Donghae Power Plant Annual Overhaul (O/H)
· GS Donghae Power Boiler Tube Wear-Resistant Coating Work
2021
GS Donghae Electric Power CO., LTD.
· Roll Tires (15 EA) for Boiler Pulverizers of GS Donghae Electric Power Units 1 and 2
· Build-Up Welding Work for Grinding Roll Tires and Bull Ring Segments of Unit 2 Pulverizer
· Inspection Door for Pyrite Room of Boiler Pulverizer #D — Unit 1
· 390 Tungsten Carbide Deflector Liners
2021
SOOSAN INDUSTRIES CO., LTD.
· B-Class Planned Preventive Maintenance Work for Boiler, Turbine, and Auxiliary Facilities of GS Donghae Electric Power Unit 1
· Metal Coating for Boiler Bundle and Wall Tubes of GS Donghae Electric Power Unit 1 Pulverizer — 67 m² and 99.25 m²
· Replacement Work for Boiler Pulverizer Coal Pipes of GS Donghae Electric Power Unit 1
· 15 Tungsten Carbide Journal Head Liners for Pulverizer
2021
KOREA MIDLAND POWER CO., LTD. Shin Boryeong P.G. Site Div.
· Removal and Overhaul of 18 Pulverizer Roll Tires for Shin Boryeong P.G Site Div. Unit 2 2020
GS Donghae Electric Power CO., LTD.
· Build-Up Welding Work for Bull Ring Segments, Covers, and Round Liners of Pulverizer ‘B’ — Unit 1
· Deflector Liner 450EA, Journal Head Liner 330EA
· Overhaul Work for Unit 1 — Pulverizer Disassembly and Maintenance
· 2021 Boiler Pulverizer Roll Tyre & Segment Build-Up Maintenance and Annual Liner Procurement
2020